Red alerts were issued by the Department of Meteorology about three days before Cyclone Ditwah made landfall in Sri Lanka. Yet at four of the six village sites we studied, no participant reported receiving a warning before impact.

That gap, between a warning being issued and a warning arriving, is where our research began. By 29 December 2025 the cyclone had left 646 people dead and 173 missing. The direct damage was about 4 per cent of GDP; about US$814 million of it, around 20 per cent, fell on agriculture.

Why look beyond the damage figures

National damage and needs came quickly. The World Bank’s Global Rapid Post-Disaster Damage Estimation (GRADE) was published within four weeks of the event, and the Government of Sri Lanka’s Post-Disaster Needs Assessment (PDNA) within four months. These products are essential for mobilising finance. They say little, however, about why some communities were warned and others were not, why some farmers received compensation and others did not, or why irrigation channels remained unrepaired six months on.

What we investigated

We applied forensic investigations of disasters (FORIN), developed under the Integrated Research on Disaster Risk programme, to agricultural recovery. The approach traces the chain of causation from hazard through exposure, vulnerability, institutional arrangements and decisions to outcomes. We organised our evidence as a chain of eight links from warning to recovery, and rated each link as functioned, partial, weak or broke down.

In May 2026 we worked at eight sites in Badulla, Nuwara Eliya and Kandy districts, with 58 participants: 50 entered in the study register (32 community members and 18 practitioners) and eight further participants not entered in the register. Community members and practitioners answered separate question sets, and we compared their accounts with documentary and physical evidence.

Figure 1: Focus group discussions during the May 2026 field work. Left: farmers and community representatives in a village home at Rendapola–Boragas (Silmiyapura), Welimada DS Division. Right: agrarian officers at a government office in Kandy District. Participants’ faces have been obscured to protect anonymity.

Figure 1: Focus group discussions during the May 2026 fieldwork. Left: farmers and community representatives in a village home at Rendapola–Boragas (Silmiyapura), Welimada DS Division. Right: agrarian officers at a government office in Kandy District. Participants’ faces have been obscured to protect anonymity. Photos: research team, May 2026 (report Photos 3.1 and 3.2, p. 28).

Location of the eight study sites in Badulla, Nuwara Eliya and Kandy Districts. Site locations are approximate.

Figure 2: Location of the eight study sites in Badulla, Nuwara Eliya and Kandy Districts. Site locations are approximate. Source: Geekiyanage, Harshani and Liyanage (2026), report Figure 3.1, p. 24. CC BY 4.0.

The limits matter. The sample was purposive rather than representative, much of the evidence is recall and self-report, some figures from resource persons could not be verified, and recovery status is as at May 2026. The findings describe these eight sites, not Sri Lanka as a whole.

Warning-to-recovery chain following Cyclone Ditwah, showing where the chain functioned and where gaps arose, as reconstructed from the evidence.

Figure 3: Warning-to-recovery chain following Cyclone Ditwah, showing where the chain functioned and where gaps arose, as reconstructed from the evidence. Source: Geekiyanage, Harshani and Liyanage (2026), report Figure ES.1, p. 12. CC BY 4.0.

What we found

Warnings were generated, but the last mile was the weakest link

The National Building Research Organisation issued Level III (Red) landslide warnings naming every study division. Risk knowledge, monitoring and warning generation functioned. Dissemination is where the chain weakened: no participant reported receiving a warning by SMS or cell broadcast. The report gives four reasons: no direct-to-household channel was used, warnings were area-wide, power and signal were lost before the peak, and officers could not reach the villages.

Where a trusted local institution relayed the warning, households moved

In Boragas–Silmiyapura, the Divisional Secretariat (the local administrative office) and the district disaster management office reached local leaders, who announced the warning from mosques and visited households on 27 November. In all, 180 families were moved to eight camps and no lives were lost. In Thalathuoya, about 90 per cent of residents evacuated after a visit from the Divisional Secretary the day before. At three sites, participants heard only a general media notice of “200 mm of rain”, which they could not interpret. Even where warnings worked, they said where to go but not where the slide would come, and they protected lives rather than livelihoods.

Cultivated land at Rendapola–Boragas (Silmiyapura) buried under landslide deposit and stripped of its water supply; the plots below the road were under vegetables before the cyclone, May 2026.

Figure 4: Cultivated land at Rendapola–Boragas (Silmiyapura) buried under landslide deposit and stripped of its water supply; the plots below the road were under vegetables before the cyclone, May 2026.
Photo: research team, May 2026 (report Photo 4.1, p. 32).

Recovery was incomplete at every site, and the constraint often sat outside agriculture

Six months on, no site had returned to pre-cyclone production. Anicuts, bunds, retaining walls and canals failed at six of the seven farmed sites. At Uva Paranagama, the Uma Ela anicut, which serves about 3,000 acres, was cleared by hand by the army because machinery could not reach it. Water was unavailable for about ten days and then for a further month while it was rebuilt. At Marassana–Wewala, recovery depended on a single bridge. The report finds that recovery was held back by an anicut, a bridge or a channel that belonged to another sector.

The Uma Ela anicut at Uva Paranagama–Bomburuella after the flood: the weir was blocked by boulders and logs and the headworks partly carried away, interrupting irrigation to about 3,000 acres, May 2026.
Photo: research team, May 2026

Figure 5: The Uma Ela anicut at Uva Paranagama–Bomburuella after the flood: the weir was blocked by boulders and logs and the headworks partly carried away, interrupting irrigation to about 3,000 acres, May 2026.
Photo: research team, May 2026 (report Photo 4.3, p. 35).

The collapsed bridge at Marassana–Wewala, Pathahewaheta DS Division: the structure carried the village's only vehicle access, and the stream bed below is choked with boulders and sand, May 2026

Figure 6: The collapsed bridge at Marassana–Wewala, Pathahewaheta DS Division: the structure carried the village’s only vehicle access, and the stream bed below is choked with boulders and sand, May 2026. Photo: research team, May 2026 (report Photo 4.8, p. 43).

Damage was reported almost universally, but information seldom returned to the farmer

Almost all participants reported losses to the Grama Niladhari (the village-level official), Development Officer or Agrarian Services Centre, and most were visited for inspection. Reporting was verbal, with no receipt or case number, and none could establish the status of their case. Officers reported that no shared platform, case-tracking system or integrated damage database is available to them; information moves by telephone, WhatsApp, letter and spreadsheet. Participants reported compensation ranging from LKR 9,000 for a bean crop that cost LKR 150,000 in inputs to LKR 35,000 for 65 perches of buried land, and several reported none for land loss or irrigation damage.

The agricultural damage reporting and recovery chain as reconstructed from participant and officer accounts, with the five bottlenecks identified.

Figure 7: The agricultural damage reporting and recovery chain as reconstructed from participant and officer accounts, with the five bottlenecks identified. Source: Geekiyanage, Harshani and Liyanage (2026), report Figure 7.1, p. 61. CC BY 4.0. Key to abbreviations in Figure 7: GN, Grama Niladhari; ASC, Agrarian Services Centre; DMC, Disaster Management Centre; DDMCU, District Disaster Management Coordinating Unit; NDRSC, National Disaster Relief Services Centre.

Communities led the early response, within the limits of their capital

Residents cleared roads, built temporary bridges from timber and fallen electricity poles, contributed LKR 2,000 per household to blast rock, and sandbagged broken anicuts. The report identifies capital as the limit on what communities could do for themselves.

Why it matters

Forensic Assessment of Post-Disaster Agricultural Recovery Systems Following Cyclone Ditwah, p. 80

For practice. The report distinguishes outputs from outcomes: institutional records describe warnings issued and assessments completed, while communities describe whether they were warned, compensated and able to replant. It sets out six functional requirements for a National Agricultural and Infrastructure Recovery Intelligence Platform. Its conclusion describes these as “modest in technology and demanding in institutions”: a registry that knows the farmer and the land before a disaster, a warning that names the village and says what to do, a report that becomes a case the farmer can follow, and an asset register showing which anicut’s repair would restore the most cultivation. It also proposes six non-technological reforms, including a last-mile procedure, a single warning voice and a funding line for minor irrigation.

For research and policy. This is a small, purposive study and cannot show how common these patterns are elsewhere. It does name what it could not establish, including village-level crop and irrigation damage figures, the basis of compensation amounts, and women’s experience of the disaster at household level. The report suggests that a recovery intelligence platform, or a follow-up study, should close these gaps. The study is from Sri Lanka, but its questions are ones any recovery system can ask: did the warning reach people, did they know what to do, and could they follow their claim?

What happens next

The report proposes four phases: governance and data standards first, then a pilot in the five study divisions, then extension across Kandy, Nuwara Eliya and Badulla and later nationally. Its timings are indicative and assume an existing institutional mandate. These are proposals for discussion. We welcome conversations with practitioners, funders and researchers interested in the requirements and evidence gaps the report describes.

Read the full report

Geekiyanage, D., Harshani, I. and Liyanage, A. (2026) Forensic Assessment of Post-Disaster Agricultural Recovery Systems Following Cyclone Ditwah: Evidence-Based Requirements for a National Agricultural and Infrastructure Recovery Intelligence Platform. Salford: University of Salford. 89 pages. ISBN 9781917780094. Open access under CC BY 4.0.

DOI: https://doi.org/10.17866/QSSF-CA46

To discuss the findings or the evidence gaps, contact Dr Devindi Geekiyanage at d.geekiyanage@salford.ac.uk.

About the authors

Dr Devindi Geekiyanage is the principal investigator and lead author of the study, based in the Faculty of Science, Engineering and Environment at the University of Salford. The co-authors are Ms Isanka Harshani (Department of Building Economics, University of Moratuwa) and Mr Amila Liyanage (Faculty of Science, Engineering and Environment, University of Salford).

The research was funded by the University of Salford QR Rapid Response Research Fund 2026 (grant SEGY0027).